This is a Tm24 ground pole kit for non-foundation application, 1 kit per 2.4m array
Kit contains:
Please see fixing details below:
Installation of the Array onto ground poles.
If your structure is supplied with ground anchor poles, you will need to follow these instructions for the final placement of the structure.
1. Your kit will consist of 2 part swivel combination clamps c/w M10 fasteners to secure, these are to be fitted onto the ends of each leg so that the clamps swivel front to back.
2. Install the 4 ground poles as shown on the structure drawing, making sure that they are positioned correctly, the distance front to back (north/south) is more critical than the distance sideways (east/West). The installation of the ground tubes will depend upon the ground conditions, a mechanical post knocker is recommended for this.
3. If the top of the tube is damaged during installation, cut the top off with an angle grinder or Hacksaw and paint end with zinc rich paint.
4. Making sure the grub screws in the swivel combination clamps allow the tubes to pass through the clamps, position the structure onto the four ground poles.
5. Lift the structure to just above the ground level and tighten the grub screws.
6. Fit a plastic end cap onto the top of each ground tube.